SOLUTION SHOWCASE
Copper Flow Batteries for medium/long duration energy storage – Halide Energy
martes 08, 15:30h - 15:45h
| Discovery Stage
Open Access
2026-09-08 15:30
2026-09-08 15:45
Europe/Madrid
Copper Flow Batteries for medium/long duration energy storage – Halide Energy
Halide Energy has developed a Copper Flow Battery technology that overcomes the challenges of limited lifespan, irreversible capacity degradation, and unsustainable life cycle which result in high lifetime costs of current batteries. The battery has no capacity degradation with fully modular configurations to meet highly critical energy storage needs.
Our technology is designed for renewable power producers and industrial energy users, providing storage durations of 4 to 12 hours with a 25 year service life, at a lower battery CAPEX than current market alternatives, avoiding costly augmentation and upgrades.
This allows end users to maximise asset revenues while minimising grid market and storage operation costs. Currently we have proven the technology at prototype scale with 3 patents covering the chemistry, rebalancing operation, and low-cost manufacture of the CFB system.
The core product is a battery storage technology that is scalable from 500kW into multi-MW systems, designed for grid and industrial scale applications ranging from 4 to 12 hours of storage depending on user needs.
Currently, Halide Energy is developing the first industrial BtM pilot projects and would be ready for commercial MW systems in 2027.
Discovery Stage
Halide Energy has developed a Copper Flow Battery technology that overcomes the challenges of limited lifespan, irreversible capacity degradation, and unsustainable life cycle which result in high lifetime costs of current batteries. The battery has no capacity degradation with fully modular configurations to meet highly critical energy storage needs.
Our technology is designed for renewable power producers and industrial energy users, providing storage durations of 4 to 12 hours with a 25 year service life, at a lower battery CAPEX than current market alternatives, avoiding costly augmentation and upgrades.
This allows end users to maximise asset revenues while minimising grid market and storage operation costs. Currently we have proven the technology at prototype scale with 3 patents covering the chemistry, rebalancing operation, and low-cost manufacture of the CFB system.
The core product is a battery storage technology that is scalable from 500kW into multi-MW systems, designed for grid and industrial scale applications ranging from 4 to 12 hours of storage depending on user needs.
Currently, Halide Energy is developing the first industrial BtM pilot projects and would be ready for commercial MW systems in 2027.